|
The Dornier Do 19 was a German four-engine heavy bomber that first flew on October 28, 1936. Only one prototype flew, and it was converted to a transport in 1938. The other two were scrapped. The ''Luftwaffe'' had a shortcoming in the lack of an efficient heavy bomber fleet. ''Generalleutnant'' Walther Wever, the ''Luftwaffe''s first Chief of Staff, was the most persistent advocate of a German long-range strategic bomber fleet. It was built for the ''Luftwaffe''s Ural bomber program under General Wever. competing against the Junkers Ju 89. The RLM ''Technisches Amt'' issued a specification for a four-engine heavy bomber. But after Wever's death in an airplane crash in June 1936, Wever's successor, Albert Kesselring, canceled Germany's long-range bomber projects to concentrate on tactical bombers. Both Dornier and Junkers were competitors for the contract, and each received an order for three prototypes in late 1935. The Dornier design was given the project number of Do 19, while the Junkers prototype became the Ju 89. ==Design and development== The Dornier Do 19 was a mid-wing cantilever design, and was mostly metal in construction. It had a rectangular-section fuselage and a tail unit, quite similar to the one fitted to the contemporary British Armstrong Whitworth Whitley medium bomber, with braced twin fins and rudders, mounted on the upper surface of the tailplane, itself set low on the rear fuselage as the Whitley's was. It also had retractable landing gear, including the tail wheel. The power plant, according to some sources, was supposed to be four Bramo 322H-2 radial engines that were mounted in nacelles at the leading edges of the wings. It had a crew of ten, which would have consisted of a pilot, co-pilot, navigator, bombardier, radio operator and five gunners. The V1 prototype flew on 28 October 1936. After ''Generalleutnant'' Wever died in an airplane crash on June 3, 1936, the heavy bomber program lost its momentum, and never recovered. When the ''Luftwaffe'' was given its heavy blow over the skies of England, the error of not having heavy bombers became apparent. But by then, it was too late in the day to develop the bombers required. Albert Kesselring, Wever's successor, believed that what Germany required was more fighters and tactical bombers. Therefore the V2 and V3 prototypes were scrapped. The original V1 became a transport in 1938. The Dornier Do 19 had a disappointing performance: it was slow, carried only a 1,600 kg bomb load and had only a medium range. In fact, the whole Ural bomber concept had already been abandoned, not only because the required range was impossible, but also because existing navigation and bomb sights were not up to the task. 抄文引用元・出典: フリー百科事典『 ウィキペディア(Wikipedia)』 ■ウィキペディアで「Dornier Do 19」の詳細全文を読む スポンサード リンク
|